Sample Retro-Commissioning Report (Data Center)
1.4 MB | 8 pages
Retro-Commissioning is the process for identifying intrinsic operational and energy related issues in the facilities DDC system and providing a mechanism for repairing/ replacing and tuning up system control and sequencing modifications.
Hot Aisle / Cold Aisle Case Study
582 KB | 7 pages
The air handling system configuration for this project commissioned by CST was designed to serve a hot aisle/ cold aisle arrangement in a 100,000 data center.
Office Retro-Commissioning Case Study (Air Handling Units)
565 KB | 24 pages
The trending charts provided on the following pages prepared as part of a retro-Commissioning investigation.
Integrated Systems Test Case Study
508 KB | 4 pages
Integrated Systems Testing provides increased assurance for facility owners and operators that the specified equipment has been installed correctly and has been coordinated to work properly with other facility equipment.
Measurement & Verification Case Study Report
1.5 MB | 5 pages
This report provides several benchmarking assessments of typical M&V systems and projects evaluated by Critical Systems Testing.